How long does a small-business website take to build?
By the YAVI Solutions team · Published
What decides the timeline of a small website build, and the three things that most often delay launch.
Key points
- Content readiness sets the pace.
- Nominate one approver.
- Locate domain access before you start.
Build time and elapsed time are different
Assembling a ten-page site on existing layouts is a matter of working days. The calendar time is usually longer because the builder is waiting for content, feedback or access.
Delay one: content
Text and photos arriving in pieces is the most common hold-up. Collect everything in one folder before the build starts.
Delay two: decisions
If several people must approve, agree who has the final say. One consolidated set of feedback per revision round keeps things moving.
Delay three: access
Nobody remembering where the domain is registered can stall a finished site for days. Find the login early.
Set a realistic date
Tell your builder about fixed dates such as an opening or a campaign. A good quote states an expected window and what it depends on.
Want to talk it through? Call 0422 222 267 or request a callback.